All edges will be jack hammered, saw-cut or machine milled. We will
make arrangement for disposal of excavated materials. The underlying material
to remain in place shall be re-compacted to 95%. After compaction and prior to
the placing of Asphalt Concrete, the vertical edges of the existing pavement
will receive a tack coat of Liquid Asphalt Binder. |
Asphalt Concrete will be installed in two lifts, unless otherwise directed,
of no less than 1 inch or greater than 3 inches in thickness (compacted).
Total thickness of asphalt patch will be indicated on the bid proposal.
American Asphalt will furnish equipment capable of producing the required
compaction of 93%. The surface, when completed will be smooth, dense, well bonded,
and of a uniform texture and appearance. The finished edges will be tack coated with
Liquid Asphalt and sanded, to prevent tracking, unless the area is to receive a Sealcoat or Slurry Seal.
American Asphalt will provide sufficient cones, barricades and other devices to guide traffic,
protect the public, and ensure a safe work zone. |